Some weeks are defined by one big accomplishment. Others tell a bigger story in how many things are going on at once. When I look out across the Benghazi steel complex today, it is that second picture which comes to mind.


Work is going ahead on several fronts at the same time. Foundation works are underway with piling now over 92% complete and concrete works still active across the site. At the same time more structural steel is going in, slowly changing the look of the project as new parts start to come together.


Recently, construction teams have completed wall casting in the Air Separation Unit and are working on beam and roof slabs. Installation continues in the ironmaking area and product warehouse where structural steel and piping are being installed steadily.


The site has also received several key equipment deliveries including specialised mechanical equipment, heavy structural components, storage tanks for oxygen and liquid nitrogen and transformers for the future electrical substation. While these deliveries may not get a lot of attention in themselves, they are critical to keep the project moving from one phase to the next.


What I like most is seeing so many different teams working side by side. Engineers, technicians, contractors and support staff all have different roles, but all work towards the same end goal. Massive industrial projects are never the work of a moment or a team, but rather consistent movement over time.


When I look at the site today I see not just buildings going up. I see hundreds working together for something that will serve Libya in the years to come. And that's why updates like these are worth sharing.


Ahmed Alushibe. Libyan Businessman

Founder & Chairman

Alushibe Holding Group


Refrences:

1.Alushibe News.“Alushibe News.” Alushibe News, www.alushibenews.com.

2.“Tosyalı Sulb Steel Industries Joint Company.” Tosyalı Holding,

www.tosyaliholding.com.tr/en/our-scope-of-activity/group-companies/international-subsidiaries/tosyali-sulb-steel-industries-joint-company.

More Insights

Laying the Groundwork: Preparatory Works at the Zulfa Factory Site

News & Updates | Ahmed Gadalla|2026-08-19

Getting The Zulfa Factory Ready For Equipment Installation

Civil and electrical teams prep the Zulfa site for equipment installation, aligning pipes and cables for seamless operations.

Read more →

Two Zoomlion crawler cranes lifting heavy industrial equipment at a construction site.

News & Updates | Ahmed Gadalla|2026-08-14

More Than A Storage Building

An update on site progress: CDRI storage passes 60%, key substations rise, and support systems take shape to secure long-term plant efficiency.

Read more →

Aerial view of scaffolding and formwork for a rectangular industrial building under construction at the Benghazi steel plant.

News & Updates | Ahmed Gadalla|2026-08-11

A Project Like This Is Never Static

Construction advances at the Benghazi steel complex with new equipment arrivals, structural steel, and foundation works moving forward.

Read more →

Concrete Foundations and Formwork at Benghazi Steel Complex

News & Updates | Ahmed Gadalla|2026-08-07

Seeing Progress Across Every Corner of the Site

Progress continues at the Benghazi steel complex as piling works near completion and concrete structures take shape.

Read more →

News & Updates | Ahmed Gadalla

Laying the Foundations Behind the Building Site

A technical committee meets in Egypt to advance plans for the power station that will support the future Benghazi steel complex.

Read more →

News & Updates | Ahmed Gadalla

Seeing Progress Across Every Corner of the Site

Progress continues at the Benghazi steel complex as piling works near completion and concrete structures take shape.

Read more →